Re: 1989 L98 Engine rebuild - Part 2: prep and install |
Subject: Re: 1989 L98 Engine rebuild - Part 2: prep and install by BillH on 2010/6/4 13:36:06 Quote:
Suggestion: Cut a 2x4 to fit between the pipes 1/4,1/2 longer than than the current width. Put it between the pipes at an angle, heat the bend and tap the 2x4 with a hammer until you get the spread you want. Let the pipes cool with the 2x4 in place. |