Re: 700R4-4L60 Build Up Part 2 |
Subject: Re: 700R4-4L60 Build Up Part 2 by PeteK on 2009/9/3 2:40:10 Now to button up the "back half" build. The governor is disassembled, cleaned and reassembled using a brand new gear and pin: New o-ring is installed on the cover, and it is tapped into place by the flanged edge only: End play is set to approx .125" by dimpling the very center of the cap. Once set, a retaing clip from a turbo 350 is installed for extra security: Speedo drive gear is installed: Photo below shows the teflon coated tailhousing bushing, being installed into the tailhousing: Next is the output shaft seal. A block of wood works well with a few well placed hammer taps: Then the tailhousing is bolted to the trans case with the 4 bolts, torqued to 24 ft lbs: Remember, trans is about 1/2 way done, at this point. |