Re: 3/21/19 Chat Room |
Subject: Re: 3/21/19 Chat Room by teebee on 2019/3/22 2:10:29 Tommy, unfortunately, that sounds like the going price for that type of detail....but it ought to be nearly perfect at that price when they are done. I got all the door trim pieces made and assembled today....it was mostly an all day job. A little break when Rosie called me and needed me to modify some shelves in a cabinet she was trying to get ready for moving stuff into. Then she decides "I think we need two more shelves in the cabinet". So a bit of time building those. I spent some time cleaning the shop up then delivered the door trim pieces to the client, he was stoked, and almost in disbelief that I had it all done in one day. I have the shop locked up and my bag packed. We will load things up in the morning and head east. |