Re: 11.13.19 |
Subject: Re: 11.13.19 by teebee on 2019/11/14 2:43:16 Hey guys....I was out of the house early so I could get a start on hanging the cabinets. By the time the other two got there, I had the high spots located and tops of base cabinets and bottom of uppers located. I had a couple items that needed attention at my shop, so I put the other two to work installing the top hinge plate and drawer slides, while I did that. Actually started the hanging of the cabinets about 9:45 and by 11:30 had the upper in place. When 'mom' came in a little after that and saw the progress, she nearly cried (tears of joy). Was a pretty chilly start, but warmed up enough that, when we were in the garage, I was in short sleeves...all the way up to 68*, but the north breeze made it feel a bit cooler. Headed back tomorrow to install the bathroom vanity and mount drawer boxes. I'm with you too, Tommy, WHERE DID THIS YEAR GO? |