Re: Bathroom remodel |
Subject: Re: Bathroom remodel by red_johnny on 2009/1/24 0:54:52 subfloor is in. Just need layer two and I will be good to go and can start doing the electrical and drywall. Monday the plumber has a few things to do and we get an estimate for the brick glass window so those places I cant mess with the dry wall yet. After the tub is in and the window I will finish the dry wall, get it tapped and sanded, primered and maybe painted then comes the tile floor. After that I can install the toilet and sink. Then I should be done. |